Critical Raw Materials Act (CRMA): What EU Law Requires from Companies and How Strategic Projects Work in Spain
Last updated 15 October 2026 · Reviewed by Jaime Piñeira Pardo, lawyer registered with the ICAM bar, no. 138826 · English version of our Spanish guide.
The short answer
The European Critical Raw Materials Act (Regulation 2024/1252, CRMA) does not require most companies to file anything: it establishes material lists, 2030 targets, and strategic projects with permits granted in 27 or 15 months. Direct obligations apply to large companies identified by the State, sellers of products with permanent magnets, and extractive waste operators. Managora prepares everything you need.
We handle the whole procedure for you, from start to finish.
You describe your case in a chat and sign; we file it with the Spanish authorities. Fixed price from €499.00 (21% VAT included), plus the tasa (official fee) where there is one.
What is new, and the law that applies
- 9 October 2026: the Commission selects 46 new strategic projects across 16 Member States, 2 in Spain (EU APT Tungsten Plant and Cobre San Rafael Project), bringing the total to 106. It announces another call for late 2026.
- 16 September 2026: Real Decreto 731/2026 (published in the BOE on the 17th, in force on the 18th), allowing projects involving critical raw materials and net-zero technologies to be declared Strategic Investment Projects.
- 17 April 2026: the BOE publishes Orden TED/352/2026, setting out the grant rules for the National Mineral Exploration Programme 2026-2030.
- 10 March 2026: the Council of Ministers approves the 1st Action Plan for the Sustainable Management of Mineral Raw Materials 2026-2030 (€414 million, 34 measures) and the National Mineral Exploration Programme (€182 million).
- 15 January 2026: the second call for strategic projects closes.
- 3 December 2025: RESourceEU plan (€3,000 million over 12 months) and proposal COM(2025) 946 to amend the CRMA, still pending adoption as of 15 October 2026, with a European Parliament plenary vote scheduled for 20 October.
- 18 November 2025: registration opens for the Raw Materials Mechanism for joint purchasing.
- 7 November 2025: China suspends until 10 November 2026 the export controls announced on 9 October 2025 (Announcement 70/2025); Announcement 18/2025 remains in force.
- Next milestone: 24 November 2026, deadline for the preliminary economic assessment study on the recovery of materials from extractive waste (Article 27).
What is the European Critical Raw Materials Act and which materials does it cover?
The European Critical Raw Materials Act is Regulation (EU) 2024/1252, known as the CRMA. It has been in force since 23 May 2024 and, like all EU regulations, applies directly in Spain. The official Spanish version refers to 'materias primas fundamentales' (fundamental raw materials), whereas search engines and the press call them 'críticas' (critical). They are the exact same thing.
It operates with two lists. Annex I covers 17 strategic raw materials: bauxite, alumina and aluminium; bismuth; boron of metallurgy grade; cobalt; copper; gallium; germanium; lithium of battery grade; magnesium metal; manganese of battery grade; graphite of battery grade; nickel of battery grade; platinum group metals; rare earth elements for permanent magnets; silicon metal; titanium metal; and tungsten. Annex II covers 34 critical raw materials: all the strategic ones plus others such as antimony, helium, hafnium, scandium, tantalum, and vanadium.
The distinction is not merely in the name. Only a strategic material grants access to the strategic project status. Rare earth elements for magnets (neodymium, praseodymium, terbium, dysprosium, gadolinium, samarium, and cerium) form a single strategic entry. Antimony, by contrast, is critical but not strategic. Quality also counts: lithium and nickel are strategic at battery grade, and the 'graphite of battery grade' entry includes synthetic graphite, not just natural graphite.
A material enters the critical list if it reaches a supply risk of 1 and an economic importance of 2.8. The Commission will review the strategic list by 24 May 2027 at the latest and every 3 years thereafter, meaning the classification of your material may change.
What are the CRMA 2030 targets and how do they affect your business?
Article 5 sets 2030 benchmarks for the Union's annual consumption of strategic raw materials overall: extraction capacity to cover at least 10%, processing capacity for 40%, and recycling capacity for 25%. Furthermore, no single third country should account for more than 65% of the Union's consumption of any individual strategic raw material.
These are targets for the Commission and Member States, not quotas for your company: nobody requires you to purchase a European percentage. However, they explain the rest of the Regulation: strategic projects with accelerated permitting, joint purchasing, and monitoring of single-supplier dependency. The 65% threshold puts the spotlight on supply chains such as rare earths and magnets, which China has subjected to export licensing since April 2025.
To measure progress, the Commission carries out stress tests on each strategic supply chain at least every 3 years, and Member States may send surveys to 'key market operators'. If your company receives one, you may refuse to provide data that would reveal trade or business secrets. Member States also report the level of their strategic stocks, although the CRMA does not oblige them to hold or release them.
What does the CRMA require from large companies under the Article 24 risk assessment?
This is the most cited and most misunderstood obligation. It only affects a 'large company' as defined by the CRMA: an average of more than 500 employees and a net worldwide turnover of more than €150 million in the last financial year for which annual financial statements have been prepared. And it only applies if the company uses strategic raw materials to manufacture batteries for energy storage or e-mobility, equipment related to hydrogen or renewable energy, aircraft, traction motors, heat pumps, data transmission and storage equipment, mobile electronic devices, additive manufacturing or robotics equipment, drones, rocket launchers, satellites, or advanced chips.
The obligation is not triggered automatically. Article 24 requires each Member State to identify these companies by 24 May 2025 at the latest, and within 12 months of each update to the strategic list. Once identified, the company must assess, at least every 3 years and to the extent that information is available, the risks to its supply chain: a mapping of where its strategic materials are extracted, processed, and recycled, an analysis of factors that might disrupt supply, and an assessment of its vulnerabilities.
The assessment is not submitted to any public authority. The company may present a report to its board of directors setting out the results, the source of the information, and mitigation measures, and the Member State may require it to do so. If a supplier does not provide the data, the assessment can be carried out using information published by the Commission or other publicly available data. If significant vulnerabilities are detected, the company must take reasonable efforts to mitigate them, for instance by diversifying suppliers or substituting the material.
On 3 December 2025, the Commission proposed tightening this article (proposal COM(2025) 946): the Commission itself would identify the companies, which would have 6 months to conduct the assessment, present the results to their board, and reply to the Commission within 30 days. As of 15 October 2026, it remains a proposal pending the European Parliament's position at first reading, with a plenary vote scheduled for 20 October. Our firm prepares the assessment and the board report as a bespoke assignment.
What changes if you manufacture or import products with permanent magnets or rare earths?
Article 28 requires labelling for magnetic resonance imaging devices, wind energy generators, industrial robots, motor vehicles, light means of transport, cooling generators, heat pumps, electric motors (including those integrated into other products), automatic washing machines, tumble dryers, microwaves, vacuum cleaners, and dishwashers. The visible, indelible label must state whether they incorporate permanent magnets and of which type: neodymium-iron-boron, samarium-cobalt, aluminium-nickel-cobalt, or ferrite. Products containing magnets of those types must also incorporate a data carrier with a unique identifier giving access to the responsible party, the weight, location, and chemical composition of each magnet, and instructions for removing them safely. If the magnets are exclusively contained in electric motors, providing the location and removal instructions for the motors is sufficient.
This obligation begins 2 years after the entry into force of the implementing act establishing the label format, which the Commission was due to adopt by 24 November 2025 (a corrigendum changed the 2026 date in the original text). For magnetic resonance imaging devices, motor vehicles, and category L vehicles, it applies from 24 May 2029. Defence and space products are excluded. The obligation lies with the party placing the product on the market, who may authorise another person to act on their behalf.
Article 29 adds a transparency obligation: if the neodymium, samarium-cobalt, or aluminium-nickel-cobalt magnets in one of those products have a total weight exceeding 0.2 kg, you must publish on a free-access website the share of neodymium, dysprosium, praseodymium, terbium, boron, samarium, nickel, and cobalt recovered from post-consumer waste. This applies by 24 May 2027 at the latest, or 2 years after the entry into force of the delegated act establishing the calculation methodology, whichever is later. For magnetic resonance imaging devices, motor vehicles, and category L vehicles, it applies 5 years after the entry into force of that delegated act. A product containing 3 motors with 0.08 kg of magnet each totals 0.24 kg and falls within the scope.
If you buy from China, the issue arises earlier. Announcement 18/2025 of 4 April 2025 remains in force and subjects to export licensing samarium, gadolinium, terbium, dysprosium, lutetium, scandium, and yttrium, as well as samarium-cobalt magnets and neodymium magnets containing terbium or dysprosium; it does not mention finished products with magnets already assembled. Gallium, germanium, antimony, and certain graphites also require a Chinese licence. The announcements of 9 October 2025 are suspended until 10 November 2026. Your supplier applies for the licence before MOFCOM, which decides within 45 working days, and your company signs the end-user certificate: Managora drafts it for you through our China end-user certificate service page, where you can check the current fee.
Regarding import costs, our import study determines the TARIC heading, customs duty, and VAT for each product. The customs declaration is filed by your company or a registered customs representative; we leave the complete study ready with everything required for that declaration.
How do you get strategic project status under the CRMA and what are the benefits?
Any project promoter for the extraction, processing, or recycling of strategic raw materials, whether inside the Union or in a third country, may apply. The Commission recognises the project if it meets 5 criteria: making a meaningful contribution to the security of the Union's supply, being technically feasible within a reasonable timeframe, being implemented sustainably (covering environmental protection, labour and human rights, engagement with local communities, and corruption prevention), and bringing cross-border benefits if located in the Union or mutual benefit if located in an emerging market.
The promoter submits the application to the Commission using the single template set out in Reglamento de Ejecución (UE) 2025/2194 (Implementing Regulation (EU) 2025/2194), via their EU Login account. It must include, among other items, the project classification according to the United Nations Framework Classification for Resources, the timetable and status of authorisations, a plan to facilitate public acceptance, ownership and control of the participating undertakings, the business plan, and estimated job creation. The CRMA does not provide for any tasa (official fee).
Applications are assessed through calls with cut-off dates. The first call opened on 23 May 2024 and closed on 22 August 2024; the second closed on 15 January 2026, and the Commission will announce a new one towards the end of 2026. The Commission checks whether the application is complete within 30 days of the cut-off date and takes a decision within 90 days of completeness, extendable by a further 90 days in exceptional cases. If the Member State whose territory is concerned objects, the project is not recognised.
What you gain is time and legal weight. The project is considered to be of public interest, and may be considered of overriding public interest for the purposes of EU habitats, water, and birds legislation. The permit-granting process cannot exceed 27 months for projects involving extraction and 15 months for projects involving only processing or recycling (24 and 12 months if the project was already in the permit-granting process), with an exceptional extension of 6 or 3 months. The time taken by the promoter to prepare the environmental impact assessment report does not count towards those deadlines. However, recognition does not exempt the project from any authorisation.
Once recognised, obligations follow: a report to the Commission every 2 years on progress, authorisations, and financing, notification of changes to the project or to the control of participating undertakings, and a public website for the local population. Managora prepares the legal and documentary file for the application and subsequent reports; the promoter submits them via their EU Login, while the resource classification and technical feasibility stem from the project's own technical studies.
Which Spanish projects are strategic and where do you apply for their permits?
The first list (Decisión (UE) 2025/840 of 25 March 2025) recognised 47 projects across 13 Member States, 7 of them in Spain. On 4 June 2025, 13 projects in third countries were approved. On 9 October 2026, the Commission selected 46 more across 16 Member States, 2 of them Spanish, bringing the total to 106. The table in this guide lists all 9 Spanish projects.
Each Member State had to designate single points of contact by 24 February 2025 at the latest, 1 per relevant administrative level and stage of the value chain. Spain has 1 per autonomous community and, for state-level projects or those affecting more than 1 autonomous community, 2: the Subdirección General de Minas (MITECO) for extraction and the Subdirección General para el Impulso de Proyectos Industriales (Ministry of Industry and Tourism) for processing and recycling. In Andalusia, for example, the Dirección General de Minas handles extraction and processing; in Extremadura, the Dirección General de Industria, Energía y Minas; in Galicia, the Dirección General de Planificación Energética y Minas. The single point of contact must confirm within 45 days whether the application is complete, and that date starts the permitting clock.
Before the single point of contact, the procedure is governed by Spanish administrative law and allows representation: Managora submits the applications on your behalf via power of attorney. Mining technical projects and environmental impact assessments must be signed by the project's qualified engineer; we do not draft them. The Spanish Mining Act remains Ley 22/1973 (the Spanish Mining Act), unchanged since 2014, although the Action Plan approved on 10 March 2026 provides for amending it to integrate the CRMA.
There is an immediate deadline that many operators overlook: Article 27 obliges operators of extractive waste facilities to submit, by 24 November 2026 at the latest, a preliminary economic assessment study regarding the potential recovery of critical raw materials from that waste. It is filed before the competent mining authority. We can submit it as your representatives; we do not draft the technical content of the study.
What does Real Decreto 731/2026 add and how does it relate to the Net-Zero Industry Act?
Real Decreto 731/2026 of 16 September (Royal Decree on Strategic Investment Projects, published in the BOE on the 17th and in force since 18 September 2026) creates the declaration of Strategic Investment Project (Proyecto Estratégico de Inversión). Eligible projects include those involving the extraction, processing, or circular economy of critical raw materials and net-zero technologies. The acquisition of shares or equity stakes, capital increases or reductions, and corporate restructurings are excluded.
The application is filed electronically via the online portal designated by the Strategic Investments Committee (Comité de Inversiones Estratégicas), and includes a formal declaration of compliance with Hacienda (the Spanish Tax Agency), the Seguridad Social (the Spanish social security system), and other public authorities, as well as declaring that the applicant is not in insolvency, bankruptcy, or payment default, using the form to be approved by the Committee. The Committee issues the preliminary declaration within 1 month and the Government Delegated Commission for Economic Affairs (Comisión Delegada del Gobierno para Asuntos Económicos) adopts the final decision within 3 months of the application; if no decision is issued, the application is deemed rejected. The royal decree does not provide for a tasa. Managora can submit it on your behalf via power of attorney.
The Net-Zero Industry Act (Regulation (EU) 2024/1735, applicable since 29 June 2024) is the sister regulation for clean technology manufacturing plants. Permits for a manufacturing plant cannot exceed 12 months below 1 GW of annual capacity and 18 months from 1 GW upwards. If recognised as a net-zero strategic project, the limit is 9 months below 1 GW, 12 months from 1 GW upwards or where capacity is not measured in GW, and 18 months for CO2 storage. That recognition is not granted by the Commission: the promoter applies to the Member State, which decides within 1 month of a complete application; if rejected, the promoter may apply to the Commission.
Do not confuse the 3 statuses: a CRMA strategic project is recognised by the European Commission, a Net-Zero Industry Act strategic project by the Member State, and a Strategic Investment Project by the Government of Spain. Each is applied for separately before its respective body.
What are RESourceEU, joint purchasing, and raw materials stockpiling?
Article 25 sets up a Commission system to aggregate the demand of undertakings established in the Union that consume strategic raw materials and to seek suppliers for that joint volume. Participating companies may jointly negotiate prices and conditions in compliance with competition law, while entities subject to Union sanctions are excluded as suppliers. This is the Raw Materials Mechanism: registration opened on 18 November 2025 and, according to the Commission, as of 9 October 2026 it has generated more than 30 matches across 10 materials. The company registers itself; we prepare your registration file.
RESourceEU is the Commission's action plan of 3 December 2025 (COM(2025) 945). It plans to mobilise €3,000 million in European funds over 12 months, establish a European Critical Raw Materials Centre in 2026 for market intelligence, stockpiling, and joint purchasing, and launch a stockpiling pilot in early 2026. It also announced that, by the second quarter of 2026 at the latest, the Commission would propose restricting exports of permanent magnet scrap and waste. It is a communication, not a legislative act: on its own, it imposes no obligations on your company.
The CRMA does not set fines. Article 47 instructs each Member State to lay down its own penalties regime, with a deadline that expired on 24 November 2025 according to the corrigendum. Any fine amount you read attributed directly to the Regulation does not come from the CRMA itself.
Step by step
- 1
Check whether your material is strategic and identify your value chain stage(Before preparing anything)
Look up your material in Annex I (strategic), not just Annex II, and verify the exact grade (battery, metallurgy). Define whether your project involves extraction, processing, or recycling: this determines the permitting deadline and the single point of contact.
- 2
Gather evidence for the 5 criteria and complete the single template(Well ahead of the call cut-off date)
The template in Reglamento de Ejecución (UE) 2025/2194 requires resource classification, permitting timetable, public acceptance plan, corporate control, business plan, and employment estimates. Managora prepares the legal and documentary file.
- 3
Submit the application during the call using your EU Login(Call cut-off date)
The promoter submits it to the Commission. The second call closed on 15 January 2026 and the Commission will announce another towards the end of 2026.
- 4
Respond to the completeness check and await the decision(30 days and then 90 days (plus 90 if extended))
The Commission checks the application within 30 days of the cut-off date and decides within 90 days of completeness, extendable by 90 days. An objection by the Member State concerned prevents recognition.
- 5
Submit permit applications to the single point of contact(Completeness in 45 days; permits in 27 or 15 months)
Either the regional body, or the Subdirección General de Minas or Subdirección General para el Impulso de Proyectos Industriales if the project falls under state competence or spans multiple regions. Managora can submit them via power of attorney; technical projects and the environmental impact assessment are signed by the project engineer.
- 6
Consider applying for a Strategic Investment Project declaration(Preliminary in 1 month; final in 3 months)
If the project is in Spain, RD 731/2026 allows you to also apply for this national declaration electronically, accompanied by a formal declaration of compliance with tax and social security obligations.
- 7
Fulfil the ongoing obligations of a recognised project(Every 2 years from recognition)
Report to the Commission every 2 years, notify any changes to the project or corporate control, and maintain the public website for the local population.
A worked example
A recycling plant recognised as a strategic project, with no permitting procedure initiated prior to recognition. The promoter submits its permit application to the single point of contact on 1 February 2027 with full documentation, and the single point of contact acknowledges completeness on 15 March 2027.
- Deadline to acknowledge that the application is complete: 1 February 2027 plus 45 days = 18 March 2027. Acknowledging it on 15 March is within the deadline.
- Start of the permitting clock: 15 March 2027, the date completeness is acknowledged.
- Maximum deadline for a recycling-only project: 15 months, until 15 June 2028.
- Maximum exceptional extension: 3 months, until 15 September 2028.
- If an environmental impact assessment is required, the time the promoter spends preparing its report does not count towards those 15 months.
The decision on all authorisations must be issued by 15 June 2028 at the latest, or by 15 September 2028 if the Member State extends the deadline before it expires and explains the reasons to the promoter in writing.
Timeline of the CRMA and accompanying legislation
| Date | Event | Who is affected |
|---|---|---|
| 23 May 2024 | CRMA enters into force (Regulation 2024/1252) | Everyone |
| 24 February 2025 | Deadline to designate single points of contact | Member States |
| 24 May 2025 | Deadline for the first identification of large companies under Article 24 | Member States and large companies |
| 24 November 2025 | Deadline for the magnet label implementing act and for national penalty regimes | Commission and Member States |
| 15 January 2026 | Cut-off date for the second call for strategic projects | Promoters |
| 18 September 2026 | RD 731/2026 enters into force (Strategic Investment Project) | Promoters in Spain |
| 9 October 2026 | Second list: 46 projects, 2 in Spain; 106 in total | Promoters |
| 10 November 2026 | Suspension of Chinese announcements of 9 October 2025 ends, unless extended | Importers from China |
| 24 November 2026 | Preliminary economic assessment study on recovery of materials from extractive waste | Operators of extractive waste facilities |
| Late 2026 | New call for strategic projects announced | Promoters |
| 24 May 2027 | Review of the strategic list; publication of recycled content in magnets (or 2 years after the delegated act; 5 years for MRI devices and vehicles) | Commission and sellers of products with magnets |
| 24 May 2029 | Magnet labelling for MRI devices, motor vehicles, and category L vehicles | Manufacturers and importers of those products |
| 2030 | Benchmarks of 10% extraction, 40% processing, 25% recycling, and maximum 65% per third country | European Union |
Recognised Spanish strategic projects (as of 15 October 2026)
| Project | Promoter | Material or activity | List |
|---|---|---|---|
| Aguablanca (Badajoz) | Rio Narcea | Cobalt, platinum group metals, copper, and nickel | First (2025) |
| CirCular (Huelva) | Atlantic Copper | Recycling | First (2025) |
| Las Navas (Cáceres) | Lithium Iberia | Battery-grade lithium (extraction) | First (2025) |
| Mina Doade | Recursos Minerales de Galicia | Lithium | First (2025) |
| El Moto | Abenójar Tungsten | Tungsten | First (2025) |
| P6 Metals | Iberian Resources Spain | Tungsten | First (2025) |
| Proyecto polimetálico (Gerena, Sevilla) | Cobre Las Cruces | Copper | First (2025) |
| EU APT Tungsten Plant | Abenójar Tungsten | Tungsten (processing) | Second (2026) |
| Cobre San Rafael Project | Cobre San Rafael | Copper (extraction) | Second (2026) |
Maximum permitting deadlines: CRMA vs Net-Zero Industry Act
| Status | Recognised by | Recognition deadline | Maximum permitting deadline |
|---|---|---|---|
| CRMA strategic project (in the Union) | European Commission | 90 days from complete application, extendable by 90 | 27 months with extraction; 15 only processing or recycling (24 and 12 if already in permitting); extension of 6 or 3 months |
| Net-zero technology manufacturing project | No recognition required | Not applicable | 12 months below 1 GW; 18 months from 1 GW |
| Net-zero strategic project | Member State | 1 month from complete application | 9 months below 1 GW; 12 from 1 GW or not measured in GW; 18 for CO2 storage |
CRMA Strategic Project vs Strategic Investment Project under RD 731/2026
| CRMA Strategic Project | Strategic Investment Project (RD 731/2026) | |
|---|---|---|
| Who decides | The European Commission, following an opinion from the Board established under the CRMA | The Strategic Investments Committee (preliminary) and the Government Delegated Commission for Economic Affairs (final) |
| Eligible projects | Extraction, processing, or recycling of strategic raw materials, in the Union or in third countries | Investment projects, including critical raw materials and net-zero technologies |
| How to apply | Single template under Reglamento de Ejecución 2025/2194, using the promoter's EU Login, during an open call | Electronically via the Committee's portal, with a formal declaration of compliance |
| Deadline | 90 days from complete application, extendable by 90 | Preliminary in 1 month; final in 3 months |
| If there is no reply | No positive administrative silence | Deemed rejected (negative silence) |
| Tasa | The CRMA does not provide for a tasa | The royal decree does not provide for a tasa |
| What Managora does | Prepares the file; the promoter submits it | Prepares and submits it via power of attorney |
Official forms and where it is filed
- CRMA Strategic Project application form (European Commission, DG GROW) ↗
- Single application template: Reglamento de Ejecución (UE) 2025/2194 (OJEU copy in the BOE) ↗
- Single points of contact for critical raw materials in Spain (MITECO) ↗
- Real Decreto 731/2026 on Strategic Investment Projects (BOE) ↗
- Net-Zero Industry Act points of contact (European Commission) ↗
- Regulation (EU) 2024/1252, European Critical Raw Materials Act (OJEU copy in the BOE) ↗
Frequently asked questions
Does my SME have any obligations under the European Critical Raw Materials Act?
Generally, you do not have to file anything. The risk assessment applies only to large companies (more than 500 employees and €150 million in turnover) identified by the State. However, you are affected by the magnet labelling and information rules if you place products listed in Article 28 on the market, and by Chinese export licences if you purchase rare earths or magnets.
Are there fines for non-compliance with the CRMA?
The Regulation itself does not set fines. Article 47 requires each Member State to adopt its national penalties regime by 24 November 2025. Be wary of any fine figure attributed directly to the CRMA.
How long does the European Commission take to recognise a strategic project?
It checks completeness within 30 days of the call's cut-off date and decides within 90 days of the application being complete, extendable by a further 90 days in exceptional cases. The next call will be announced towards the end of 2026.
Does strategic project status replace mining permits or environmental impact assessments?
No. Recognition does not affect requirements under EU, national, or international law. It shortens and streamlines the permitting process (27 or 15 months maximum) and grants the project public interest status, but every individual permit must still be obtained.
Do I need a licence to import neodymium magnets from China?
Your Chinese supplier applies for the licence before MOFCOM, and only for controlled items: samarium-cobalt magnets and neodymium magnets containing terbium or dysprosium, whether in magnet or powder form. Neodymium magnets without those elements are not listed in Announcement 18/2025. Your company signs the end-user certificate, which Managora drafts for you.
Can the list of strategic raw materials change?
Yes. The Commission will review it by 24 May 2027 at the latest and every 3 years thereafter. Synthetic graphite, for instance, is currently included under battery-grade graphite, but the Commission will assess whether it should remain.
We handle the whole procedure for you, from start to finish.
You describe your case in a chat and sign; we file it with the Spanish authorities. Fixed price from €499.00 (21% VAT included), plus the tasa (official fee) where there is one.
Related procedures
The price, the tasa (official fee) and the current deadlines are on each procedure page.
- End-user certificate to import rare earths, magnets and critical minerals from China (MOFCOM export licence)We draft the end-user and end-use certificate that your Chinese supplier must file with MOFCOM to apply for...
- Import study for your goods: TARIC code, duties, VAT and controlsBefore you buy, we tell you in writing how much it will cost to import your goods and what customs will req...
Managora for Import / Export
Your international trade, prepared and defended: TARIC code, duties and import VAT before you buy, binding tariff information, EORI, AEO (OEA) certification, dual-use licences, end-user certificate for China, Intrastat and Modelo 349 (EU sales list). The customs declaration is lodged by your company or by a registered customs representative.
See the package →If you are refused or need to appeal
Handled by Managora's law firm.
Related guides
- Importing Rare Earths and Magnets from China: Export Licence, End-User Certificate and Tariffs
- Conflict Minerals and the EU Battery Regulation: Due Diligence, Battery Passport and Producer Registration
- Mining Investigation Permits and Exploitation Concessions in Spain: Sections A to D, Deadlines, Fees, Restoration and Strategic Projects (Rare Earths, Lithium, Tungsten)
- Exporting Scrap Metal and Waste from Spain: Waste Dealer or Broker Registration, Green List and Prior Notification
- CBAM: the carbon border adjustment if you import
- Deferred import VAT: how to avoid paying it at customs
- Exporting outside the EU: VAT, customs declarations and proof of exit
- Importing and exporting: EORI, DUA and customs
- Importing Chemicals into Spain: REACH, CLP Labelling, Drug Precursors and F-Gases
- Importing food, feed and plants into Spain: border sanitary controls, CHED (DSCE) in TRACES, prior registrations and what happens if a consignment is rejected