2026 Grants for Building Renovation in Spain: State Housing Plan, 60% Income Tax Deduction and 10% VAT

Last updated 13 November 2026 · Reviewed by Jaime Piñeira Pardo, lawyer registered with the ICAM bar, no. 138826 · English version of our Spanish guide.

The short answer

In 2026, a community of property owners renovating its building in Spain can combine 3 incentives: grants from the 2026-2030 State Housing Plan, called by each autonomous community except the Basque Country and Navarre; a 60% deduction in each owner's IRPF (Spanish personal income tax) for energy efficiency works paid until 31 December 2027; and 10% reduced VAT on the works. Each requires different documents and deadlines.

We handle the whole procedure for you, from start to finish.

You describe your case in a chat and sign; we file it with the Spanish authorities. Fixed price from €300.00 (21% VAT included), plus the tasa (official fee) where there is one.

See the procedure

What is new, and the law that applies

  • 24-4-2026: the Plan Estatal de Vivienda 2026-2030 (Real Decreto 326/2026) enters into force, introducing the comprehensive building renovation grant and the option to extend NextGen grant deadlines.
  • 30-6-2026: deadline to finish works under the NextGen building renovation programme, unless extended by the bilateral monitoring committee.
  • 8-10-2026: Real Decreto-ley 29/2026 declares State Plan renovation grants exempt from IRPF (ratified on 12-11-2026, BOE of 13-11-2026).
  • 23-10-2026: Ley 4/2026 obliges the community to apply for accessibility grants presented by an owner and makes the works mandatory with no cost cap if awarded grants cover 70%.
  • 1-12-2026: the 10% IVA rate on renovation and repair works requires paying the contractor via banking channels and is extended to homes rented out as a habitual residence (Real Decreto-ley 29/2026, ratified on 12-11-2026).
  • 31-12-2026: last day to pay for works under the 20% and 40% individual home deductions and to justify NextGen grants before the Ministry.
  • 31-12-2027: last day for payments qualifying for the 60% deduction on whole-building works.

What grants and tax reliefs are available in 2026 to renovate a residential building in Spain?

There are 4 sources of funding or savings, and they can almost always be combined. The first is the direct grant from the Plan Estatal de Vivienda 2026-2030 (the 2026-2030 State Housing Plan, regulated by Real Decreto 326/2026, in force from 24 April 2026), which funds comprehensive building renovation covering structural safety, accessibility, habitability and sustainability. The community of property owners can be the beneficiary. The central government sets the framework, but you apply through the call published by your autonomous community (or Ceuta and Melilla), which sets the opening and closing dates. The Plan does not apply in the Basque Country or Navarre.

The second is a tax relief claimed by each individual owner rather than the community: a deduction in IRPF for building energy renovation works, worth 60% of the amount paid, backed by before-and-after energy performance certificates. The third is reduced IVA (Spanish value added tax, VAT) at 10% on renovation and repair works when the recipient is the community of owners. The fourth is municipal: optional rebates on ICIO (the municipal tax on constructions, installations and works) and IBI (the annual municipal property tax) if your local council's tax bylaws provide for them.

In addition, there are the NextGenerationEU grants under Real Decreto 853/2021 (the Royal Decree on EU-funded housing renovation programmes), which are no longer open to new applications but which many communities have already been awarded and still need to complete and justify. For those communities, 2026 is the key year: the works had to be completed before 30 June 2026, unless an authorised extension was granted.

How much does the 2026-2030 State Housing Plan pay for building renovation?

Real Decreto 326/2026 sets maximum amounts per home and per square metre of commercial premises, capped at a percentage of total cost. The exact figure your building receives is decided by your regional call within those maximums. Anything not fixed in the Royal Decree (budget allocation, application deadline, order of award) depends on each regional call, and there is no single deadline for the whole of Spain.

For structural safety (structure and fire protection of the building envelope), the grant covers up to €8,000 per home and €90 per square metre of ground-floor commercial premises, capped at 40% of the cost. If combined with accessibility or with habitability and sustainability, it rises to €12,000 per home, €135 per square metre and 60% of the cost. If the Libro del Edificio Existente (Existing Building Book, an official technical diagnostic report) states that structural safety works are needed, you cannot access the remaining grants without carrying them out.

For accessibility (lifts, stairlifts, ramps, automatic doors, video intercoms, induction loops and similar items), the grant covers up to €13,000 per home and €145 per square metre of premises, and never more than 70% of the cost. It rises to €18,000 per home if a person with a recognised disability of 33% or more, or aged over 65, lives in the building (and the cap rises to 80%), up to €20,500 if the disability is 65% or more, and up to €22,000 when the works achieve full universal accessibility for the property.

For habitability and sustainability (building envelope, energy efficiency, asbestos removal, radon gas protection), the maximum comes from the table in Annex II of the Royal Decree according to the energy savings achieved. If work is only done on certain elements of the envelope, the grant can reach 40% of the investment, capped at €7,500 per home. Boilers or generators running on fossil fuels are not subsidised. Under this line, non-recoverable IVA and tasas (official fees) paid by the community count as eligible costs, as do technical and management fees within the statutory limits.

The building must have been completed before 2006 (your autonomous community may allow others), have an architectural project or technical report with the Libro del Edificio Existente filed electronically at the Registro de la Propiedad (Land Registry), include a waste management study preparing at least 70% by weight for reuse or recycling, remove any asbestos using an officially registered company, and not exceed average market costs. The grant is compatible with other subsidies for the same purpose, except other grants under the same Royal Decree, provided the total does not exceed the cost of the works.

Who applies for the grant, how is it shared among owners, and what voting majority is needed?

The application is submitted by the community of property owners (or a grouping of communities), backed by a resolution passed at the owners' meeting. The grant goes in full towards paying for the works, even though it is then allocated among the owners under horizontal property rules. If a neighbour is legally barred from receiving public subsidies, their share is prorated among the remaining owners as agreed by the community. A tenant who pays for the works in exchange for rent can ask the community for a resolution allowing them to apply.

Pay close attention to how the grant is divided: the building grant is split by participation quota (or, if none exists, by usable floor area) exclusively among the homes that serve as the habitual and permanent residence of the people living in them. Second homes and empty flats do not participate in the grant allocation. That is why it is advisable to gather the empadronamiento certificates (municipal register of inhabitants certificates, from the padron) or proof of residence before applying.

To approve works that improve energy efficiency verifiable by certificate, or shared renewable energy systems including the building envelope, and to apply for grants or financing for them, a simple majority of owners representing a simple majority of ownership quotas is enough, provided the annual cost passed on to owners, after deducting grants and applying financing, does not exceed 12 ordinary monthly community fee payments (art. 17.2 of the Ley de Propiedad Horizontal, the Horizontal Property Act). Owners who vote against still have to pay: these are general community expenses. Shared solar panels, aerothermal and geothermal systems are approved by 1/3 of owners and quotas, but their cost cannot be charged to owners who did not vote in favour (art. 17.1).

Regarding accessibility, from 23 October 2026 (Ley 4/2026) works requested by owners in whose home or premises persons with disabilities or aged over 70 live, work or volunteer are mandatory without requiring a community vote, provided the annual cost passed on after deducting grants does not exceed 12 monthly community fee payments. The owner requesting the works can present the grant calls and the community is legally obliged to apply for them; if the awarded grants cover 70% or more of the total cost, the works are mandatory with no cost cap. Managora's guide on how to require a ramp or lift explains what to do if the community refuses.

What happens to awarded NextGen grants if the building works were not finished by 30 June 2026?

The building-level renovation programme under Real Decreto 853/2021 requires works to be completed before 30 June 2026, and the documentation proving completion and compliance must reach the Ministry before 31 December 2026. That documentation is forwarded by your autonomous community, which sets its own earlier deadline for the community of owners. Check your grant award resolution and the regional call: your exact deadline is stated there.

The 2026-2030 State Plan opened a lifeline: the bilateral monitoring committee can authorise, on an exceptional basis and depending on the project's degree of progress, an extension of the execution and justification deadlines for programmes 1, 2, 3 and 6. It is not automatic: you must request it through your autonomous community, providing proof of the actual status of the works.

If the conditions are only partially met or only part of the works is executed on time, the grant is adjusted and paid partially, with a proportional clawback where applicable, unless an essential obligation is breached, which leads to full revocation (art. 4 of Real Decreto 853/2021). For energy savings the rule is stricter: if the final savings, comparing the before-and-after certificates, fall below the project estimate, the grant is recalculated according to the savings actually achieved; however, if it fails to reach at least a 30% reduction in non-renewable primary energy, or fails to meet the required heating and cooling demand reduction, the entire grant is revoked (art. 35.8). A clawback requires repaying the amount received plus statutory late-payment interest from the date of payment (art. 37 of the Ley General de Subvenciones, the General Subsidies Act). Justification requires the final works completion certificate, the before-and-after energy certificates generated with the same recognised software and officially registered, and photographic documentation of the completed works.

How much can each owner deduct in Spanish income tax (IRPF) for building energy efficiency works?

Each owner of a home in a predominantly residential building can deduct 60% of their share of the cost of building energy renovation works carried out until 31 December 2027 (disposición adicional 50.ª of the Ley del IRPF, the Personal Income Tax Act). Parking spaces and storage rooms purchased together with the home are treated as part of it. Any portion of the home used for an economic activity does not qualify.

The technical requirement is twofold: an energy performance certificate for the building before the works (valid provided no more than 2 years have elapsed between its issue date and the start of works) and another after completion, both issued and registered under Real Decreto 390/2021, proving either a reduction in non-renewable primary energy consumption of at least 30% or an upgrade to energy class A or B. The post-works certificate must be issued before the end of the tax year in which you claim the deduction and, in all cases, before 1 January 2028.

The maximum annual deduction base is €5,000 per owner, and any excess not deducted in that year can be carried forward to the next 4 tax years, up to a cumulative base cap of €15,000 (maximum total tax deduction: €9,000). Your base is calculated by applying your ownership participation quota to the amount paid by the community. It covers construction works, professional fees, the architectural project, site management and certificates, but excludes equipment running on fossil fuels.

There are 2 rules that cost owners money if forgotten. Only amounts paid by the community by card, bank transfer, nominative cheque or bank account deposit to the contractor or certificate issuer qualify: anything paid in cash gives no tax deduction. Furthermore, you must subtract any grant awarded or pending definitive award resolution. The Dirección General de Tributos (Directorate-General for Taxation, part of Hacienda, the Spanish Tax Agency or AEAT) applies this rule to community owners in binding rulings V1728-25 and V0280-24: each owner deducts what the community paid in proportion to their quota.

The 20% and 40% deductions (for works inside your individual home) end earlier: amounts paid up to 31 December 2026 with a post-works certificate issued before 1 January 2027. They cannot be combined with the 60% deduction when the improvement and payments relate to whole-building works. If the community installs shared self-consumption solar panels in 2026, there is a separate 20% deduction for owners (maximum base of €5,000), which is incompatible with the 60% deduction for the same installation.

Do owners have to pay income tax (IRPF) on the building renovation grant?

A community of property owners has no separate legal personality for IRPF purposes, so any income or grant it receives is attributed to each individual owner. That is why the key question is whether each neighbour must declare their share of the subsidy on their tax return. Grants under Real Decreto 853/2021 (NextGen) have been exempt from the IRPF tax base since 2021 (disposición adicional 5.ª.4 of the Ley del IRPF).

Real Decreto-ley 29/2026, in force since 8 October 2026, added to that tax-exempt list the grants under the building renovation, accessibility and urban and rural renewal line of the 2026-2030 State Housing Plan. The Diputación Permanente del Congreso (the standing committee of Congress) ratified Real Decreto-ley 29/2026 on 12 November 2026 (BOE, the Official State Gazette, of 13 November 2026).

The fact that the grant is tax-exempt does not mean you can ignore it when calculating your tax deduction: the base for the 60% deduction is what you actually pay out of pocket after subtracting the grant. If the grant is awarded in a tax year after you claimed the deduction, you must regularise your tax return.

When do community building works qualify for 10% reduced VAT in Spain?

Renovation and repair works on residential buildings are taxed at 10% IVA when the recipient on the invoice is the community of property owners, the construction or last structural rehabilitation of the building finished at least 2 years before these works began, and the contractor either supplies no materials or supplies materials whose cost does not exceed 40% of the taxable base (art. 91.Uno.2.10.º of the Ley del IVA, the Value Added Tax Act). If materials exceed that 40% threshold, the invoice carries 21% IVA, unless the works, contracted directly by the community acting as developer with the builder, qualify as a structural rehabilitation for IVA purposes (more than 50% of the total project cost spent on consolidating or treating the structure, facades or roofs, or analogous works such as installing lifts or connected works, AND total works cost exceeding 25% of the building's market value when works begin, or of its purchase price if bought within the previous 2 years, excluding land value in both cases): in that scenario, the whole project goes at 10% regardless of the cost of materials supplied (art. 91.Uno.3.1.º of the Ley del IVA).

Real Decreto-ley 29/2026 amends this rule with effect from 1 December 2026: the 10% rate will only apply if the works are paid for by card, bank transfer, nominative cheque or bank deposit in favour of the contractor, and it is extended to works on homes used for long-term residential letting, regardless of who the landlord is. This Royal Decree-Law was ratified on 12 November 2026. In any event, the community should always pay the contractor via bank transfer: if it pays in cash, the owners also lose the IRPF tax deduction, which only accepts amounts paid by the community through those banking channels to the builder or certificate issuer.

Because a community of property owners is not a VAT-registered business, it cannot reclaim input IVA, meaning the reduced 10% rate is direct cash saved by every neighbour. Under the habitability and sustainability grants of the State Housing Plan, that non-recoverable IVA counts as an eligible subsidisable cost.

Do you need a municipal works permit and can you get ICIO or IBI tax rebates?

Almost any work on a facade, roof, structure or entrance requires a municipal works licence or a formal declaration of compliance (declaración responsable), depending on your local council's bylaws. It is also a mandatory document for the grant: to collect advance payments under the State Plan, the community must submit the municipal licence or authorisation together with the works commencement certificate signed by the supervising architect and officially stamped by their professional association. If the local council takes more than 6 months to grant the licence, the 36-month execution period can be extended by the length of the delay, up to a maximum of 12 months.

ICIO allows rebates of up to 95% for works declared to be of special municipal interest or utility, which are requested from the council and approved by the full council plenary, and up to 95% for works incorporating approved solar or ambient energy systems. IBI allows rebates of up to 50% for properties fitted with those energy systems. All these rebates are optional for councils: they only exist if your municipality's local tax bylaws include them, and must be requested within the deadlines set by those bylaws.

Managora handles your municipal works permit and the building's energy performance certificate, and prepares the renovation grant application with all your community's documentation. You can check the updated fixed price on each service page. Managora's guide on challenging community resolutions explains what to do if a neighbour appeals the works agreement.

Step by step

  1. 1

    Initial diagnostic and pre-works energy certificate(Before starting the works)

    Commission the Libro del Edificio Existente and the building's energy performance certificate before starting. It must be officially registered and be no more than 2 years old when works begin.

  2. 2

    Owners' meeting resolution(Before applying for the grant)

    Approve the works, the grant application and, where applicable, the financing and special levy. For energy efficiency works, a simple majority of owners and quotas is enough if the annual cost passed on, after deducting grants, does not exceed 12 monthly fee payments.

  3. 3

    Architectural project or technical report(Before applying for the grant)

    Must include a waste management study (70% by weight for reuse or recycling), asbestos removal if present, and a budget within average market costs. The Libro del Edificio Existente is filed electronically at the Registro de la Propiedad.

  4. 4

    Application under the regional call(Within the window set by your autonomous community's call)

    The community submits the application with the meeting resolution, the project, the pre-works certificate and proof of habitual residence for the homes participating in the grant share.

  5. 5

    Works licence and municipal taxes(Before starting the works)

    Apply for the municipal works licence or file the declaration of compliance, and apply for the ICIO tax rebate if your local council's bylaws provide for it.

  6. 6

    Contractor agreement and invoices(Throughout the entire works)

    Invoices issued in the name of the community, contractor materials not exceeding 40% of the taxable base for 10% IVA (unless the project qualifies as structural rehabilitation for IVA purposes), and all payments by the community to the contractor and technicians made by bank transfer or card, never in cash.

  7. 7

    Execution of the works(Maximum 36 months from grant award, extendable due to licence delays or external causes)

    Once you have the licence and the officially stamped commencement certificate, you can request advance grant payments if the regional call allows them.

  8. 8

    Completion of works and justification(As set by the regional call; post-works certificate before 1-1-2028 for the 60% tax deduction)

    Submit the final works certificate, the registered post-works energy certificate and proof of payment so the autonomous community orders the payout.

  9. 9

    Individual owner certificate and IRPF tax return(Income tax filing season for the year in which payment was made and the certificate issued)

    The property administrator gives each neighbour a certificate stating the amount paid by the community during the year, their ownership quota and their share of the grant. Each owner claims the deduction on their IRPF return.

A worked example

A community of owners renovates its building envelope in 2026. Taxable base of the works: €272,727.27. The regional call awards a grant of €120,000 (illustrative figure). All flats are habitual residences. Ana has a 5% participation quota. The community pays everything by bank transfer in 2026 and the post-works certificate, showing a 35% energy saving, is issued in December 2026.

  • IVA at 10%: €272,727.27 x 10% = €27,272.73. Total works cost: €300,000.00 (at 21% it would be €330,000.00: €30,000.00 saved).
  • Ana's share of the works: €300,000.00 x 5% = €15,000.00.
  • Ana's share of the grant: €120,000.00 x 5% = €6,000.00.
  • Deduction base: €15,000.00 - €6,000.00 = €9,000.00 (below the €15,000 cumulative cap).
  • 2026 tax return: maximum annual base €5,000.00 x 60% = €3,000.00.
  • 2027 tax return: the remaining €4,000.00 carries forward to the next year: €4,000.00 x 60% = €2,400.00.
  • Total tax deduction: €3,000.00 + €2,400.00 = €5,400.00.

Ana pays a community levy of €15,000.00, receives €6,000.00 from the grant and deducts €5,400.00 in income tax over 2 years: her net out-of-pocket cost is €15,000.00 - €6,000.00 - €5,400.00 = €3,600.00.

Grants and tax incentives for building renovation in 2026

IncentiveAmountKey requirementWhere to applyDeadline
2026-2030 State Plan: structural safetyUp to €8,000/home and €90/m² of premises, max. 40% (€12,000, €135/m² and 60% if combined)Need confirmed by the Libro del Edificio ExistenteRegional callPer regional call; works within 36 months
2026-2030 State Plan: accessibilityUp to €13,000/home (€18,000, €20,500 or €22,000 depending on case) and €145/m², max. 70% (80%)Community resolution or mandatory works under art. 10.1.b LPHRegional callPer regional call; works within 36 months
2026-2030 State Plan: habitability and sustainabilityAnnex II table by energy savings; partial envelope works: up to 40% and €7,500/homeEnvelope compliant with CTE HE1; no fossil fuel boilersRegional callPer regional call; works within 36 months
NextGen RD 853/2021 (already awarded)Amount stated in your award resolutionWorks finished before 30-6-2026 or authorised extensionAutonomous communityJustification to the Ministry before 31-12-2026
Building IRPF deduction (DA 50.ª.3)60% of amount paid; base €5,000/year, €15,000 cumulative30% energy saving or class A or B, before-and-after certificates; bank paymentEach owner's IRPF tax returnPayments until 31-12-2027; certificate before 1-1-2028
Building self-consumption IRPF deduction (DA 62.ª)20%; base €5,000/yearInstallation in 2026 with electrical installation certificateIRPF tax returnInstallation in 2026
Reduced IVA (VAT)10% instead of 21%Recipient is the community, building finished or rehabilitated at least 2 years before works, materials up to 40% (no cap if structural rehabilitation for IVA)Applied by contractor on invoiceNo end date; bank payment from community to contractor from 1-12-2026 (RDL 29/2026, ratified on 12-11-2026)
ICIO rebateUp to 95% rebateSpecial municipal interest or solar/ambient energyLocal councilPer municipal bylaw
IBI rebateUp to 50% rebateApproved solar or ambient energy systemsLocal councilPer municipal bylaw

Tax deduction for whole-building works vs works inside your individual home

Community works on the building (60%)Works inside your home (40%)
Percentage60%40% (20% if it only reduces heating and cooling demand by 7%)
Maximum base€5,000 per year, €15,000 cumulative with 4-year carry-forward€7,500 per year (€5,000 for the 20% deduction)
Required improvement30% reduction in non-renewable primary energy or class A or B for the building30% reduction in non-renewable primary energy or class A or B for the home
Eligible paymentsUntil 31-12-2027Until 31-12-2026
Post-works certificateBefore 1-1-2028Before 1-1-2027
Who claims itEach owner according to their participation quotaThe owner of the habitual or rented home

Official forms and where it is filed

  • Regional call application form for building renovation grants (Plan Estatal de Vivienda 2026-2030)
  • Building energy performance certificate, before and after, registered with the regional body (Real Decreto 390/2021)
  • Libro del Edificio Existente for renovation (Annex III of Real Decreto 326/2026)
  • Municipal works licence or declaration of compliance (declaración responsable) before the local council
  • ICIO self-assessment form and rebate application under the municipal tax bylaw
  • Modelo 100, each owner's annual IRPF income tax return ↗

Frequently asked questions

When do applications open for the 2026-2030 State Housing Plan building renovation grants?

It depends on your autonomous community: the Royal Decree does not set a single date. Each region publishes its own call in its official regional gazette with its own application window. The State Plan does not apply in the Basque Country or Navarre.

Can the owner of a second home benefit from the renovation grant?

Not in the allocation of the State Plan grant: only homes that are a habitual and permanent residence participate in the subsidy share. However, a second-home owner can claim the 60% IRPF deduction on their share of the building works.

Can I pay my special community levy (derrama) in cash?

We do not recommend it, although the decisive factor is how the community pays the suppliers. Each owner's IRPF deduction is calculated on what the community pays the contractor and technicians by card, bank transfer, nominative cheque or bank deposit, and from 1 December 2026 the 10% IVA rate requires that same bank payment to the contractor (Real Decreto-ley 29/2026, ratified on 12 November 2026). If the community pays in cash, both tax advantages are lost. Paying your levy by bank transfer also gives you the simplest proof of your contribution.

Can a tenant claim the 60% IRPF tax deduction?

No: the 60% tax deduction is strictly for property owners. Under the State Plan, a tenant who pays for the works in exchange for rent can be the beneficiary of the direct grant if the community of owners agrees to it.

Do I have to declare the building renovation grant on my Spanish income tax return?

NextGen grants under Real Decreto 853/2021 are not included in your taxable base. Neither are grants under the building renovation, accessibility and urban and rural renewal line of the State Plan from 8 October 2026, under Real Decreto-ley 29/2026, ratified on 12 November 2026. In all cases, they must be subtracted from your tax deduction base.

We handle the whole procedure for you, from start to finish.

You describe your case in a chat and sign; we file it with the Spanish authorities. Fixed price from €300.00 (21% VAT included), plus the tasa (official fee) where there is one.

See the procedure

Related procedures

The price, the tasa (official fee) and the current deadlines are on each procedure page.

If you are refused or need to appeal

Handled by Managora's law firm.