Gestoría guides

Installing a Lift in a Spanish Community of Owners: Voting Rules, Cost Sharing, Grants and Ley 4/2026

Last updated 13 November 2026 · Reviewed by Jaime Piñeira Pardo, lawyer registered with the ICAM bar, no. 138826 · English version of our Spanish guide.

The short answer

To install a lift in a Spanish community of owners, a simple majority of owners and ownership quotas is enough, binding everyone to pay even if the cost exceeds 12 monthly community fees. If a resident is over 70 or has a disability, the work is mandatory without a vote when the annual cost after grants stays within 12 monthly fees, or when awarded grants cover 70%.

We handle the whole procedure for you, from start to finish.

You describe your case in a chat and sign; we file it with the Spanish authorities. Fixed price from €164.00 (21% VAT included), plus the tasa (official fee) where there is one.

See the procedure

What is new, and the law that applies

  • 23 October 2026: Ley 4/2026 enters into force (published in the BOE on 3 October). It lowers to 70% the grant threshold that makes a lift mandatory without a cost cap, obliges the community to apply for grants submitted by the owner, and spreads the annual cost calculation over the years of the financing.
  • 23 October 2026: new third additional provision of the LPH, which obliges public administrations to allocate sufficient funds in their budgets for universal accessibility grants in residential buildings and makes promoting these works a priority.
  • 24 April 2026: the Plan Estatal de Vivienda 2026-2030 (Real Decreto 326/2026) enters into force, including communities of owners as beneficiaries of building rehabilitation grants.
  • 1 December 2026: the 10% VAT rate on renovation and repair works becomes conditional on paying by card, bank transfer, nominative cheque or account deposit (Real Decreto-ley 29/2026, ratified on 12 November 2026, BOE of 13 November 2026).

What majority is needed to install a lift in a community of owners?

A simple majority: more than half of the owners who, in turn, represent more than half of the participation quotas. This is stated in artículo 17.2 of the Ley de Propiedad Horizontal (LPH, the Spanish Horizontal Property Act) for works that remove architectural barriers and, "in all cases", for establishing a lift service, even if the master deed or community statutes must be modified.

There is no need for anyone elderly or with a disability to live in the building to use this majority: the lift qualifies for it in its own right. Nor does the three-fifths rule of artículo 17.3 ever apply, as that is reserved for concierge, caretaker, security and other services of general interest. If someone at the owners' meeting tells you that the lift requires three-fifths or unanimity, they are mistaken.

Everything linked to the installation is approved with the same majority: the technical project, cost sharing, special levy (derrama), loan, grant applications and compensation for any owner giving up private space. The Dirección General de los Registros y del Notariado, now the Dirección General de Seguridad Jurídica y Fe Pública (resolution of 25 October 2019), reflects the Supreme Court's criteria: resolutions directly associated with the lift, including how its expenses are distributed, are adopted with the same majority as the main resolution.

Once approved, the resolution binds everyone, including those who voted against it: artículo 17.2 states that the community is obliged to pay even if the annual amount passed on to owners exceeds 12 ordinary monthly payments. Dissenters under the rule for non-essential improvements (artículo 17.4) have no way out here, because that rule expressly excludes whatever is required for the accessibility of the building.

When is installing a lift mandatory without a vote (residents over 70 or with a disability)?

Artículo 10.1.b of the LPH, as amended by Ley 4/2026 (in force since 23 October 2026), makes two types of works mandatory without a prior resolution from the owners' meeting: those necessary to guarantee universal accessibility (and, in all cases, reasonable adjustments) and those requested by owners in whose home or commercial premises people with a disability or aged over 70 live, work or provide voluntary services. The law expressly lists ramps, lifts and mechanical and electronic devices.

A person with a disability is someone who has foreseeably permanent physical, mental, intellectual or sensory impairments which, when faced with barriers, may hinder their full participation in society, and also anyone officially recognised as having a disability degree equal to or greater than 33% (artículo 4 of the consolidated text of the Ley General de derechos de las personas con discapacidad, the General Act on the Rights of Persons with Disabilities). That article equates Grade I dependency to 33%, and Grades II and III to 65%, although that equivalence only takes effect in areas provided for by law or by regulations that expressly include it, and artículo 10 of the LPH does not mention it.

The limit is financial: the amount passed on to each owner per year, once public subsidies or grants are deducted, cannot exceed 12 ordinary monthly payments of common expenses. If the community takes out financing, that annual amount is spread over as many years as the loan allows, so an expensive project can stay within the cap if paid in instalments.

New rule under Ley 4/2026: the person requesting the work can submit the calls for grants for which the community is eligible, and the community is obliged to apply for them. And if the grants actually awarded reach 70% of the cost of the works, the installation is mandatory with no cap on monthly payments (before the reform, the threshold was 75%).

If the grants do not reach 70% or the cost exceeds the limit, the work remains mandatory provided that those who requested it cover the excess. And if, when all the above conditions are met, the community fails to carry it out, the interested party can ask the court to compel it. That legal action has its own case guide at Managora: here we explain how the work is carried out when it goes ahead.

Who pays for the lift: quotas, ground-floor flats and commercial premises?

The general rule is the participation quota set in the master deed or whatever is specifically established in the statutes (artículo 9.1.e LPH). If a flat has a 4% quota, it pays 4% of the works, whether it is on the first floor or the penthouse. Mandatory works under artículo 10 are paid for by the owners, and the owners' meeting resolution is limited to setting the special levy and how it is paid (artículo 10.2.a).

The owners' meeting can agree on a different cost breakdown for the lift (for example, higher floors paying more, or a ground-floor flat that gives up space paying nothing) with the same majority required for the installation, provided it does not seriously prejudice one or more owners. This resolution is the one most frequently challenged in court, so the reasons for it should be recorded in the minutes.

Ground-floor flats and commercial premises: if the statutes exempt them from entrance hall, staircase or lift expenses, everything depends on the exact wording of the clause. Not using the lift does not in itself exempt an owner from paying for it (artículo 9.2 LPH). The courts do not follow a uniform criterion on whether an exemption designed for maintenance and running costs extends to installing a brand-new lift: the clearer the clause is in referring to installation or new works, the stronger the exemption. Without such a clause, you should expect commercial premises and ground-floor flats to pay their share.

Who does not pay the amount exceeding 12 monthly fees: this only applies under the mandatory route of artículo 10.1.b. If the work is imposed without a vote and exceeds the cap, the excess is paid by the owners who requested it. If the meeting approves it by majority (artículo 17.2), everyone pays according to their quota, even if it exceeds the cap.

In mandatory works under artículo 10.1.b, flats and premises are legally bound to the payment under the same terms as general expenses under artículo 9 (artículo 10.2.c); if the lift is approved at a meeting under artículo 17.2, the charge on the property is that of general expenses under artículo 9.1.e. In both cases, if someone sells without paying, the buyer is liable with the property itself, up to the amount owed for the elapsed part of the year of purchase and the 3 preceding calendar years (artículo 9.1.e). Non-payment is claimed through the community debt recovery procedure (procedimiento monitorio), which has its own guide.

Can the community occupy the entrance hall, courtyard or part of a flat to fit the lift?

Yes. During the works, the community can occupy common elements (artículo 10.1.c LPH). For the permanent shaft, the Ley de Suelo y Rehabilitación Urbana (artículo 24.4, the Spanish Land and Urban Rehabilitation Act) allows occupying open or public-domain spaces and common areas assigned to private use, such as lobbies, landings, roofs, overhangs and arcades, on the ground, underground or in the airspace above, when no other solution is technically or economically viable. Urban planning instruments must guarantee this, either by allowing that surface area not to count towards buildable volume or minimum boundary distances, or through another technique that achieves the same purpose.

If part of a flat or commercial unit must be taken, each owner is obliged to consent to the easements strictly required for common works and services agreed in accordance with the law, with the right to be compensated by the community for any damages and losses (artículo 9.1.c). Land Registry doctrine accepts this easement without the affected owner's consent if the legal majorities are reached and the burden does not strip their home or premises of habitability or functionality.

In practice: the technical project must justify that there is no less burdensome alternative, the owners' meeting approves both the easement and the compensation (or its calculation basis) in the same resolution, and nobody occupies anything before having the resolution or a court judgment. Occupying space without formal authorisation exposes the community to having to restore everything to its original state.

What permits are needed: technical project, building permit and ICIO tax?

A new lift affects the structure, facade or courtyard, so it almost always requires a technical project signed by a qualified architect or engineer, which is also a requirement for State Plan grants (artículo 97.b of Real Decreto 326/2026). With the project, you apply for a building permit (licencia urbanística) or submit the statement of compliance (declaración responsable) required by your local municipal ordinance; the exact procedure is set by each town hall and each autonomous community.

Managora submits the building permit application to the town hall on behalf of the community: see the licencia_obras_municipal service page (you can check the updated price on the page). The municipal tasa (official fee) and the tax are paid by the community.

Along with the permit or statement of compliance comes the Impuesto sobre Construcciones, Instalaciones y Obras (ICIO, the municipal tax on construction, installations and works). An interim payment is assessed on the budget and, upon completion, the town hall adjusts it to the actual final cost (artículo 103.1 of the Ley de Haciendas Locales, the Local Treasuries Act). The local tax ordinance may provide a rebate of up to 90% for works that improve access and habitability for people with disabilities (artículo 103.2.e). It is not automatic: you must apply for it in the manner specified by the ordinance, usually together with the permit application.

Once the work is finished, the installation company registers the lift and puts it into service before the regional industry authority, in accordance with the technical regulations for lifts. From that day on, the lift has its own maintenance and inspection obligations, which become part of the community's ordinary budget.

What grants are available for installing a lift in 2026?

The national framework is the Plan Estatal de Vivienda 2026-2030 (Real Decreto 326/2026, the State Housing Plan in force since 24 April 2026). Its grant for the comprehensive rehabilitation of residential buildings aims at upgrading safety, accessibility, habitability and sustainability, as applicable, including a certified improvement in energy efficiency (artículo 95), and installing lifts is expressly listed among its eligible accessibility actions (artículo 98.2.a). For accessibility, the grant covers up to €13,000 per dwelling and 70% of the cost; it can rise to €18,000 per dwelling and 80% if a person with a disability of 33% or more or aged over 65 lives in the building, and up to €20,500 per dwelling if the disability is 65% or more (artículo 99.2). Communities of owners can be beneficiaries (artículo 96.1.c). Grants are called and awarded by the autonomous communities (artículo 100), and each call sets the deadlines and specifies whether it accepts a lift as a standalone action or only within a broader refurbishment with energy improvements. The Plan does not apply in the Basque Country or Navarre (artículo 1.5).

Building requirements under this scheme (artículo 97): completed before 2006 (the autonomous community may admit newer buildings); a technical project, or a technical report if a project is not required, with the Libro del Edificio Existente (Existing Building Book) filed electronically at the Land Registry; a waste management study with at least 70% by weight prepared for reuse or recycling; asbestos removal by a registered company; a resolution from the community of owners; and costs that do not exceed average market rates. Furthermore, if the Libro del Edificio Existente reveals that structural safety works are needed, you cannot access the accessibility grant without carrying out those safety works too (artículo 99.4).

A detail that often surprises owners at meetings: the subsidy is distributed by quota among the flats that serve as a habitual and permanent residence. Empty flats, holiday homes or tourist rentals do not participate in the distribution of the grant, even though they pay their share of the works (artículo 97.f). The community must use the entire grant to pay for the works (artículo 96.3).

In addition, there may be separate regional or municipal calls and, depending on the autonomous community, residential rehabilitation programmes funded by European NextGeneration funds under Real Decreto 853/2021. If a call under those programmes is still open in your autonomous community, Managora submits the application on behalf of the community: see the rehabilitacion_residencial_nextgen service page (you can check the updated price on the page). Ley 4/2026 added a third additional provision to the LPH: public administrations must allocate sufficient funds in their budgets for universal accessibility grant programmes in residential buildings, and promoting accessibility works will be a priority in their housing and urban agenda policies.

Managora prepares and submits the community's application for the regional call of the State Plan. Before signing the building contract, check the call rules to see whether it accepts works that have already started: Real Decreto 326/2026 does not set this rule for this grant, leaving it to each regional call; if the call requires works not to have started, starting early will disqualify you from the grant.

What VAT rate applies to lift works and can the reserve fund be used?

Renovation and repair works in residential buildings are taxed at 10% VAT when the recipient is the community of owners, the construction or last rehabilitation ended at least 2 years earlier, and the materials supplied by the contractor do not exceed 40% of the taxable base (artículo 91.Uno.2.10.º of the Ley del IVA, the Value Added Tax Act). In a lift installation, the machinery itself makes up a large part of the budget, so the 40% threshold is easily exceeded and the invoice is then taxed at 21%, unless the project qualifies as structural rehabilitation for VAT purposes. Ask the company for a breakdown of materials and labour before signing.

From 1 December 2026, Real Decreto-ley 29/2026, ratified on 12 November 2026, makes the 10% rate conditional on paying for the work by credit or debit card, bank transfer, nominative cheque or deposit into a bank account held by the contractor. Always pay through the bank: never make cash payments to the contractor.

The community reserve fund (fondo de reserva) can be used to pay for accessibility works under artículo 10.1.b and artículo 17.2 (artículo 9.1.f LPH). It must be at least 10% of the last ordinary budget; whatever is spent on artículo 10 works during the year continues to count towards that minimum and is replenished at the start of the following financial year (first additional provision).

What if a neighbour challenges the lift resolution or the law is different (Catalonia)?

A resolution can be challenged in court by anyone who voted against it (salvó su voto), anyone who was absent, or anyone who was improperly deprived of their right to vote, and they must be up to date with community payments or deposit what they owe in court (artículo 18.2 LPH). The deadline expires 3 months after the resolution, or after 1 year if it is contrary to the law or the statutes; for absent owners, the period runs from when they are notified (artículo 18.3). Challenging the resolution does not halt the works unless the judge orders it as an interim measure (artículo 18.4). That is why the minutes must accurately record the vote and be notified to all absent owners.

Before filing a lawsuit to challenge the resolution, or claiming unpaid levies through the debt recovery procedure, you must attempt the prior negotiation required by Ley Orgánica 1/2025. If the dispute reaches that stage, it falls under our firm's litigation case guide, rather than this administrative process.

In Catalonia, the LPH does not apply; instead, the Civil Code of Catalonia governs: installing lifts and removing architectural barriers are approved by a simple majority of the owners participating in the vote, who must simultaneously represent a simple majority of the total participation quotas of those voting (artículo 553-25.2.a), and the expenses are borne by everyone if they derive from a meeting resolution (artículo 553-30.3). The Ley 4/2026 reform regarding the 70% grant threshold does not apply there.

Step by step

  1. 1

    Check which legal route applies(Today)

    If a person aged over 70 or with a disability (33% or more) lives, works or volunteers in a flat or commercial unit, the owner can request mandatory works under artículo 10.1.b. If not, it is put to the owners' meeting for a simple majority vote (artículo 17.2).

  2. 2

    Commission a feasibility study and a quote(Before calling the owners' meeting)

    Qualified architect or engineer: where the shaft fits (courtyard, stairwell, facade), whether private space must be occupied, cost broken down into materials and labour (which determines the VAT rate) and schedule. Using the quote, calculate how much each flat will pay per year.

  3. 3

    Locate open calls for grants(Along with the study)

    The 2026-2030 State Plan call in your autonomous community, plus regional and municipal grants. Under the artículo 10.1.b route, the owner requesting the work submits them in writing and the community is obliged to apply for them.

  4. 4

    Request the works or place them on the agenda(Ordinary meeting: at least 6 days' notice)

    Written request to the president with proof of age or disability and the grant calls (mandatory route), or a request to include it on the meeting agenda (voting route). Summon everyone, including commercial premises without access through the entrance hall, at their registered notification address.

  5. 5

    Approve the entire package at the meeting(At the owners' meeting)

    In the same resolution: installation, technical project, contractor or method of selecting them, cost distribution, special levy and payment schedule, loan if applicable, grant application, easement and compensation if private space is occupied, and use of the reserve fund. Ensure the minutes record who votes which way and with what quotas.

  6. 6

    Notify the minutes to absent owners(As soon as possible after the meeting)

    Their deadline to challenge the resolution runs from that notification. Keep proof of delivery.

  7. 7

    Apply for the grant under the call(Within the call deadline)

    The community, as beneficiary, submits the application with the project, Libro del Edificio Existente, meeting resolution and quotes. Managora submits it on behalf of the community. If the call requires works not to have started, do not sign the building contract beforehand.

  8. 8

    Building permit or statement of compliance and ICIO tax(Before starting the works)

    With the project, submit the application to the town hall requesting the ICIO tax rebate if the local ordinance provides for it. Managora handles this for you (licencia_obras_municipal service page).

  9. 9

    Sign the contract, execute the works and commission the lift(According to the work schedule)

    Contract with the correct VAT rate applied, payments strictly via bank, work completion certificates signed by the project manager, and registration for service by the installation company.

  10. 10

    Justify the grant and collect special levies(Upon completion of the works)

    Submit invoices and proof of payment to the public administration within the call deadline; claim unpaid levies through the community debt recovery procedure.

A worked example

Building without a lift. Works costing €120,000. The third-floor neighbour is 78 years old and her son, the owner, requests the works under artículo 10.1.b. His flat has a 5% quota and pays €60 per month in community fees. Awarded grants: €48,000 (40%). The community takes out a 6-year loan for the remainder, with €4,800 in total interest.

  • Annual cap for the flat: €60 x 12 = €720.00.
  • Net cost after grants: €120,000 - €48,000 = €72,000.00.
  • Without a loan, the flat's share would be: €72,000 x 5% = €3,600.00 in 1 year, exceeding the cap: it would not be mandatory (unless the person requesting it pays the excess).
  • With a loan: €72,000 + €4,800 = €76,800.00; for the flat, €76,800 x 5% = €3,840.00.
  • Spread over 6 years: €3,840 / 6 = €640.00 per year, below the €720.00 cap.
  • If the awarded grants had been €84,000 (84,000 / 120,000 = 70%), the works would be mandatory regardless of the cap.

With the 6-year financing in place, the works are mandatory for the community without needing a vote: each year the third-floor flat pays €640.00, staying within its €720.00 cap.

Legal routes to install a lift in the community (LPH after Ley 4/2026)

RouteWho triggers itMajorityWho paysCap
Mandatory work (art. 10.1.b)Owner with a person over 70 or with a disability in their flat or premisesNone: the meeting only distributes the levyEveryone by quota up to the cap; the excess is paid by whoever requested it12 monthly fees per year, after deducting grants and spreading financing
Mandatory work with 70% grants (art. 10.1.b)Same, with awarded grants covering at least 70% of the costNoneEveryone by quotaNo cap
Meeting resolution (art. 17.2)Any owner who puts it on the agendaMajority of owners and quotasEveryone by quota, including those who voted againstNo cap: binding even if it exceeds 12 monthly fees
Three-fifths majority (art. 17.3)Does not apply to liftsNot applicableNot applicableNot applicable
Catalonia (art. 553-25.2.a CCCat)Any ownerMajority of those voting, representing a majority of their quotasEveryone if derived from a resolutionLey 4/2026 does not apply

Key costs and requirements to keep in mind

ItemDetailsLegal basis
VAT on the works10% if contractor's materials do not exceed 40% of the base and construction or last rehabilitation ended at least 2 years ago; otherwise 21% unless qualifying as structural rehabilitationArt. 91.Uno.2.10.º LIVA
Payment method for 10% VAT from 1-12-2026Card, bank transfer, nominative cheque or account depositRDL 29/2026 (ratified on 12-11-2026)
ICIO tax rebateUp to 90% if provided for by the local ordinance (accessibility)Art. 103.2.e TRLRHL
Reserve fundMinimum 10% of the last ordinary budget; can be used for the liftArt. 9.1.f and DA 1.ª LPH
State Plan grants: building ageBuilding completed before 2006 (unless regional exception applies)Art. 97.a RD 326/2026
Grants: distributionOnly among dwellings used as a habitual residenceArt. 97.f RD 326/2026
Challenging the resolution3 months; 1 year if contrary to the law or statutesArt. 18.3 LPH

Request mandatory works or put it to a vote at the meeting?

Mandatory work (art. 10.1.b)Simple majority resolution (art. 17.2)
RequirementPerson over 70 or with a disability in the flat or premises, or universal accessibilityNone: wanting the lift is enough
VoteNot requiredMajority of owners and quotas
Cost limit12 monthly fees per year after grants; no limit with 70% grantsNo limit
Excess over the limitPaid by whoever requested the workPaid by everyone
GrantsThe community is obliged to apply for them if provided by the ownerAgreed to apply for them at the same meeting
If the community fails to actYou can ask the judge to compel itWithout a resolution, there is no work

Official forms and where it is filed

  • Building permit application or statement of compliance for works (your town hall's online portal)
  • ICIO tax self-assessment and application for accessibility rebate (town hall)
  • Building rehabilitation grant application under the regional call of the Plan Estatal de Vivienda 2026-2030
  • Libro del Edificio Existente for rehabilitation (anexo III of Real Decreto 326/2026) ↗
  • Official resolution recognising the degree of disability (regional authority)

Frequently asked questions

Can I refuse to pay for the lift if I voted against it?

No. If the owners' meeting approves it by a majority of owners and quotas, you pay your quota even if you voted against it and even if it exceeds 12 monthly payments (artículo 17.2 LPH). You can only challenge it in court if there is a legal ground: within 3 months of the resolution, or within 1 year if it is contrary to the law or the statutes (artículo 18.3 LPH).

I live on the ground floor and will not use the lift. Do I have to pay?

As a general rule, yes, according to your quota. You are exempt if the statutes exempt you with a clause that covers new installations, or if the meeting, with the same majority that approves the lift, agrees on a cost distribution that exempts you without seriously prejudicing another owner. Not using the lift does not exempt you on its own (artículo 9.2 LPH), and if your statutory clause only mentions lift maintenance or running costs, whether it covers a brand-new installation is doubtful: the courts do not rule on this uniformly.

What are the 12 monthly payments for the lift?

What you pay in ordinary community fees over 1 year. If the mandatory work costs you more than that per year, once grants are deducted and financing is spread out, the community is not obliged to do it unless the person who requested it pays the excess or the grants reach 70%.

Is it mandatory to install a lift if someone over 70 lives in the building?

Yes, if the owner of that flat requests it and the annual amount passed on to each owner does not exceed 12 monthly payments after deducting grants, or if the awarded grants cover 70%. No vote is needed.

Can the community take part of my flat or landing for the lift?

It can impose an easement over whatever space is strictly essential if it is approved with the legal majority, there is no other viable solution, and your home does not lose its habitability. In return, the community compensates you for damages and losses.

Are there grants for installing a lift in 2026?

Yes. The Plan Estatal de Vivienda 2026-2030 includes lift installation among the accessibility works covered by its building rehabilitation grant, which is called by each autonomous community (it does not apply in the Basque Country and Navarre), and there may also be separate regional and municipal calls. Whether the work can have started before applying is decided by each call; Managora submits the application on behalf of the community.

We handle the whole procedure for you, from start to finish.

You describe your case in a chat and sign; we file it with the Spanish authorities. Fixed price from €164.00 (21% VAT included), plus the tasa (official fee) where there is one.

See the procedure

Related procedures

The price, the tasa (official fee) and the current deadlines are on each procedure page.

If you are refused or need to appeal

Handled by Managora's law firm.

Related guides

Share this guide

If you found it useful, chances are someone you know needs it right now.